B-1.1, r. 2 - Construction Code

Full text
4.11. Before carrying out the construction work referred to in section 4.01, a contractor or an owner-builder shall obtain the plans and specifications prepared by a recognized person.
The first paragraph does not apply to maintenance, repair or demolition work on an elevator or other elevating device.
O.C. 848-2024, s. 1.